The Pogo underground mine has been in production since 2006 and NSMS took over underground operations in September 2018. Since that time, Pogo has transitioned from primarily cut and fill to mostly longhole stoping with paste filling. We have also transitioned to high-speed development using jumbos to bolt-mesh-bore which, until recently, was not common practice in North America.
NSMS Personnel
375
Duration
2018 - Ongoing
Equipment
01
Sandvik 422i Jumbo
05
Sandvik 421 Jumbo
04
Atlas Production Drill
09
Sandvik 517 Loader
02
Sandvik TH551
6
Epiroc MT65S
04
Normet Charge Up Machine
11
Volvo Integrated Tool Carrier
02
Volvo Grader
My time here at Pogo has been both challenging and rewarding. The people from the senior leadership all the way down to the level one miner have been amazing. It makes me proud to be part of the team. I’m excited to be a part of helping meet the company’s targets and goals.