Porphyry underground was started by NSMS in October 2022. Development rates with the single Jumbo have been excellent, averaging over 450m a month this FY. Production commenced in September 2023 with longhole open stoping being the main method.
NSMS Personnel
110
Duration
2022 - Ongoing
Equipment
01
Sandvik 422i Jumbo
01
Epiroc Production Drill
01
Sandvik 621i Loader
01
Sandvik 517i Loader
02
Sandvik 663i Truck
01
Normet Charge Up Machine
03
Volvo Integrated Tool Carrier
01
CAT Grader