The Ramone underground was started by NSMS in November 2021. Development rates have been excellent averaging over 500m a month and we are now in production. The mining method is open stoping and drilling is currently in progress to extend the life of the mine.
NSMS Personnel
100
Duration
2021 - Ongoing
Equipment
01
Sandvik 421 Jumbo
01
Epiroc Production Drill
02
Sandvik 517 Loader
03
Sandvik 663 Truck
01
Normet Charge Up Machine
02
Volvo Integrated Tool Carrier
01
CAT Grader