The HBJ (Hampton-Boulder-Jubilee) underground mine has been operated by NSMS since 2018. We are currently developing the NOZ, Muturoo and Muturoo North declines and associated mining using the long hole stoping method.
The HBJ is staffed with the personnel mainly residing in Kambalda, 20km south of the operation.
NSMS Personnel
125
Duration
2018 - Ongoing
Equipment
01
Sandvik 421 Jumbo
01
Epiroc Production Drill
03
Sandvik 517 Loader
04
Sandvik 663 Truck
01
Normet Charge Up Machine
03
Volvo Integrated Tool Carrier
01
Komatsu Grader